World's most comprehensive concrete cover calculator with multi-code support, 3D visualization, and AI-powered recommendations
cnom = cmin + Δcdev
Where:
cmin = max{cmin,b; cmin,dur + Δcdur,γ - Δcdur,st - Δcdur,add; 10mm}
Calculate concrete cover for multiple elements at once
Compare concrete cover requirements for different conditions side-by-side
Detailed comparison of requirements across different design codes
| Parameter | ACI 318-19 | Eurocode 2 | CSA A23.3 | AS 3600 |
|---|---|---|---|---|
| Interior (Slab) | 0.75" (20mm) | 20-25mm | 20mm | 20-40mm |
| Exterior (Beam) | 1.5" (40mm) | 40-50mm | 40mm | 40-50mm |
| Soil Contact | 3" (75mm) | 50-75mm | 75mm | 50-75mm |
| Marine Exposure | 2-2.5" (50-65mm) | 50-60mm | 50-60mm | 60-75mm |
| Deviation Allowance | 0.25" (5-10mm) | 5-15mm | 10mm | 5-10mm |
Concrete cover is the distance between the outer surface of the concrete and the nearest reinforcing steel. Proper cover is essential for:
Given:
Solution:
| Time | Type I Cement | Type III Cement | High-Early |
|---|---|---|---|
| 1 day | 15-20% | 35-40% | 40-50% |
| 3 days | 40-50% | 60-70% | 70-80% |
| 7 days | 65-75% | 85-90% | 90-95% |
| 28 days | 100% | 100%+ | 100%+ |