Measurement inputs
Live calculation updates the result, shape, formula, and report data.
Live
Used in saved report.
Switches starter units only.
Foundation footprint
Thickened perimeter edge
Optional interior thickened beam
Waste, bags, and cost
10% is common for many jobs.
Waste cannot be negative.
Optional concrete price.
Cost cannot be negative.
Used only for cost estimate.
Bag counts always round up.
Live 3D foundation preview
Labels are based on your actual input values.
Length
–
Width
–
Slab thickness
–
Edge total depth
–
Order quantity with waste
–
Enter valid dimensions to calculate the foundation concrete volume.
Total before waste–
Cubic feet–
Cubic meters–
Estimated cost–
Base slab volume
–
Thickened edge extra
–
60 lb bags
–
80 lb bags
–
Foundation area
–
Interior beam extra
–
Waste added
–
Bag basis
–
Formula used
The report saves this formula, the steps, and the full SVG diagram.
Total foundation volume = slab volume + thickened edge extra volume + optional interior beam extra volume.
This is an estimate. Confirm final quantity with your contractor, engineer, or concrete supplier before ordering.