Measurement inputs
Live calculation
Used in the saved report.
Switches dimensions and report units.
Use waste volume when ordering bags.
Common values: 5%, 10%, or 15%.
Waste cannot be negative.
Optional. Leave blank if cost is not needed.
Cost cannot be negative.
Result dashboard
Rounded estimatesCalculated slab slope
—
—
Enter valid measurements to calculate slab slope and concrete quantity.
Slope ratio—
Slope angle—
Fall per foot—
Total fall—
Base volume—
Order with waste—
60 lb bags—
80 lb bags—
Slab area—
Cubic feet—
Cubic meters—
Estimated cost—
Formula used
Shown in report
Slope (%) = Total fall ÷ Run length × 100
Angle = atan(Total fall ÷ Run length)
Concrete volume = Length × Width × Slab thickness
Angle = atan(Total fall ÷ Run length)
Concrete volume = Length × Width × Slab thickness
- Enter valid values to see the full calculation steps.
Volume uses slab thickness. The slope changes the fall across the slab. If your slab thickness changes from one end to the other, use the average thickness in the thickness field.